by s2desi5_ai3architects | Mar 2, 2023 |
The new Abington Co-Located Pre-K/Middle/High School allowed Abington to solve multiple programmatic needs with a single new facility. This school is often referred to as “three schools within a school” because the high school, middle school, and Pre-K are all within...
by s2desi5_ai3architects | Mar 16, 2018 |
The Jackson-Walnut Park Schools operates two schools on a single contiguous campus serving grades Pre-K thru 6. Ai3 worked collaboratively with the Jackson-Walnut Park Schools for several years to assist them in developing, master planning, and revitalizing their...
by baker | Mar 31, 2015 |
Ai3 transformed the Cardinal Spellman High School campus through multiple design projects that helped the private Catholic school achieve their Master Plan goals. As part of the “Cardinal Spellman in the 21st Century” campaign, Ai3 prepared a Master Plan and...
by s2desi5_ai3architects | Mar 16, 2015 |
After a very competitive selection process, Ai3 was selected to design the new 405-pupil, 40,008 sq. ft. high-profile Blackstone Valley Prep Charter Elementary School 2 in Cumberland, Rhode Island. The progressive integrated public charter school needed a new facility...