by baker | Mar 10, 2023 |
The J.R. Lowell Elementary School sits atop a prominent hill in Watertown within a densely populated residential neighborhood that includes many historic homes. Proposed modifications required careful considerations regarding the impact to the surrounding...
by s2desi5_ai3architects | Mar 10, 2023 |
Cunniff Elementary School is a 79,883sf new construction project serving 385 students in grades K-5. As the smallest of the three elementary schools in Watertown, every square inch of the existing 3.9-acre site was valuable. A single-story addition from decades before...
by s2desi5_ai3architects | Mar 10, 2023 |
Hosmer Elementary School is a 143,500sf new construction project serving 590 elementary school students in grades K-5 and 200 pre-kindergarten and preschool students in its Early Childhood Learning Center. As the largest of the three public elementary schools in...
by s2desi5_ai3architects | Mar 2, 2023 |
The new Abington Co-Located Pre-K/Middle/High School allowed Abington to solve multiple programmatic needs with a single new facility. This school is often referred to as “three schools within a school” because the high school, middle school, and Pre-K are all within...